The Champlain Bridge Ice Control Structure Maintenance
In
2001, the Corporation awarded a contract worth $311,896 to replace the
lighting system on the Champlain Bridge ice control structure. The
lighting system was part of the original construction and had not been
operational for many years. It had become necessary to upgrade the system
as the ice control structure had been put into operation as a bike path in
the summer and is used by contractors performing repair work on the
Champlain Bridge nearby.
|
|
|
|